Hi Experts,
Please tell me how to change packages in existing maintenance plans.
i have tried LSMW with batch input recording /Direct input method 0490 and IBIP program, but changes to all operations is not possible .
System is taking only 1st operation everytime .
Is there any other possible way in standard to change Maintenance package of a maintenance plan/item in bulk.
Regards,
Abhijeet