Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 2175

Basic finish date on planned order

$
0
0

Dear Experts,

 

I have a situation where a plant with a 7 day calendar is feeding demand to a plant where the specific subset of machines needed to satisfy the demand only run a 5 day calendar (although the rest of the supplying plant run 7 days preventing me applying a 5 day calendar at the plant level).  I have attached a 5 day calendar to the work centres at the supplying plant, and have my production scheduling profile set up to adjust the basic dates on planned orders (OPU5). 

 

I was expecting the finished dates on the planned orders to cover only 5 days a week, but this does not appear to be the case.  When I look in MD04 I see demands for all 7 days of the week.  The production days in the planned order respect the 5 day calendar, and when I convert to production orders this also respects the 5 days.  Is it possible to get the planned order basic dates to respect the 5 day calendar.

 

(As info there are no production versions or alternate routes in play)

 

I did try using a Planning Calendar with a PK lot size, which did almost achieve the results I wanted, but I appear to be restricted to entering a maximum of 4 days in the week days selection (MD25) which is a show stopper.

 

Thanks in advance,

 

Jez


Viewing all articles
Browse latest Browse all 2175

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>